
ADB Construction & Interiors carries out full house refurbishment projects across Gerrards Cross and the SL9 area. A whole house refurbishment takes a dated or neglected property and rebuilds it from the inside out, with new wiring, plumbing, heating, plaster, kitchens, bathrooms and decoration. It is the most involved work we do and the most rewarding. Our design and build approach means the layout, services and finishes are planned together as one scheme, then delivered by one team under full project management. Call 07700 170091 to discuss your property.
More Information
Painting over a bad layout wastes money. Before any refurbishment we look at how the whole house could work better. That might mean removing a wall between kitchen and dining room, moving a bathroom, or stealing space from a wide hallway. Because our designers and builders plan the project together, structural changes are priced and scheduled into the refurbishment from day one rather than added as costly extras later.
The biggest value in a full refurbishment is the work you cannot see. We rewire to current standards, replace old pipework, upgrade heating systems and add insulation while the walls are open. Doing this once, properly, during a whole house project costs far less than doing it room by room over a decade. Your refurbished Gerrards Cross home will be safer, warmer and cheaper to run.
Our interior design service runs alongside the building work, so the finished house follows one coherent scheme rather than a series of separate decisions. Flooring, lighting, joinery, kitchens and bathrooms are chosen early and ordered in good time, which protects the programme. When we hand over a refurbishment, every room is decorated, every fitting works and the house is ready to live in that day.
ADB Construction & Interiors was founded 6 years ago in the Gerrards Cross area. The idea was simple. Bring designers and builders together in one business so clients stop losing time, money and patience between separate firms. That approach has won us steady work across the SL9 postcode and beyond, from kitchen extensions in Chalfont St Giles to full rebuilds near Stoke Poges. We design it, we build it, and we manage it, all under one roof.
Design and build under one roof, one team from start to finish
Full project management from drawings to handover
6 years designing and building in Gerrards Cross and the SL9 area
Open Monday to Friday 8am to 6pm and Saturday 10am to 4pm
Clear written quotes and honest advice on every project
A recent whole house project was a 1960s property in Farnham Common, on one of the quiet roads near Burnham Beeches. The house had not been touched in thirty years. We rewired and replumbed it, opened the kitchen into the garden room, fitted two new bathrooms and redecorated throughout in a sixteen week programme. The owners walked their dog in the Beeches most mornings while we worked, and moved back into what felt like a new house.
STILL NOT SURE?
Most full house refurbishments in Gerrards Cross take 3 to 6 months depending on the size of the property and the extent of structural work. ADB Construction & Interiors provides a detailed programme with your quote and manages the project so each trade arrives in the right order.
For a full refurbishment we usually recommend moving out, because water, power and heating are disconnected during the strip out stage. Some clients in the Gerrards Cross area stay in one section of the house while we work in phases. We will give you honest advice on what suits your project.
Refurbishing is often cheaper once you account for stamp duty, fees and moving costs in the Gerrards Cross area, and it lets you stay on a street you love. A refurbishment also adds value to the property you already own. We can help you weigh up both options with a free site visit and quote.
LET US KNOW HOW WE DID?
Leave us a Review...
Your feedback helps others find a professional they can trust.
READY TO TAKE THE NEXT STEP?
t: 07700 170091
Mon: 8am-6pm
Tue: 8am-6pm
Wed: 8am-6pm
Thu: 8am-6pm
Fri: 8am-6pm
Sat: 10am-4pm
Sun: Closed
Gerrards Cross
Beaconsfield
Amersham
Buckinghamshire
Iver
© Copyright 2026. ADB Construction & Interiors. All rights reserved.
Address: Building 1 Chalfont Park, Gerrards Cross, UK